Search

Project

Quilici Ranch

Client

Toll Brothers

Location

Reno, Nevada

Project Overview
nev

The 1,200-acre development includes roughly 1,220 single-family residences, 182 multifamily units, an elementary school site, backbone infrastructure, box culvert crossings within the Steamboat Ditch, several onsite and offsite water storage tanks, and booster pump stations.

E
Engeo's Role

ENGEO prepared the geotechnical report for the project. Services included review of geologic maps, aerial photos, and pertinent reports, subsurface field exploration (test pits, borings, and fault trenches), soil laboratory testing, engineering analyses, and report preparation. Significant geologic and geotechnical concerns include ancient landslides, expansive soil, and grading within complex hillside terrain.

P
People

Our fantastic people set us apart

Meet our people
C
Contact Us

Explore how we can best serve you.